Integrated Construction Management: A Methodology for Operational Efficiency And Waste Reduction in the United States Construction Industry

##article.authors##

DOI:

https://doi.org/10.37497/opsbrazil.49

Keywords:

Construction Management, Lean Construction, Materials Control, Quality Control, Rework, United States

Resumo

Fragmentation among planning, procurement, inspection, quality, and monitoring activities may hinder the timely identification of constraints and nonconformities in construction projects. This article proposes an integrated construction management methodology, referred to in this manuscript as the Integrated Planning, Materials, and Quality Model (IPMQM), designed for future application and evaluation in residential and commercial projects in the United States. The research is applied in nature, adopts a qualitative approach, and is technical and proposal-oriented, drawing on a targeted narrative review of the literature on lean production, collaborative planning, quality management, and rework, supplemented by a mapping of the professional competencies reported by the author. The model comprises six operational modules, control documents, decision rules, and performance indicators. As a theoretical outcome, a replicable implementation protocol and a before-and-after evaluation plan are presented, without attributing empirically unverified effectiveness to the proposed model. Future application will require adaptation to the standards, contracts, and licensing requirements applicable to the relevant U.S. state and type of construction project.

Downloads

Não há dados estatísticos.

Biografia do Autor

Tomaz Lucas Souza Ferreira , Faculdade Presidente Antônio Carlos de Teófilo Otoni

Tomaz Lucas Souza Ferreira is a civil engineer who graduated from Faculdade Presidente Antônio Carlos de Teófilo Otoni, Brazil, in 2020. He has approximately five years of professional experience in the construction industry, including construction planning, site monitoring and inspection, technical measurements, project documentation review, materials and services control, schedule monitoring, and quality control. His technical and academic interests focus on integrated construction management, operational efficiency, construction planning, waste reduction, and the improvement of project control and execution processes.

 

Referências

BALLARD, Glenn. The Last Planner System of Production Control. 2000. Doctoral dissertation — University of Birmingham, Birmingham, 2000. Available at: https://etheses.bham.ac.uk/id/eprint/4789/.

BALLARD, Glenn; TOMMELEIN, Iris. 2020 Current Process Benchmark for the Last Planner Sys-tem of Project Planning and Control. Lean Construction Journal, pp. 53–155, 2021. DOI: https://doi.org/10.60164/47e7h7a1b.

INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO). ISO 9001:2026: Qua-lity Management Systems — Requirements. Geneva: ISO, 2026. Available at: https://www.iso.org/standard/9001.

LOVE, Peter E. D.; EDWARDS, David J. Determinants of rework in building construction projects. Engineering, Construction and Architectural Management, vol. 11, no. 4, pp. 259–274, 2004. DOI: https://doi.org/10.1108/09699980410547612.

LOVE, Peter E. D. Quantifying the Costs of Field Rework in Construction. Journal of Construction Engineering and Management, vol. 152, no. 1, 2026. DOI: https://doi.org/10.1061/JCEMD4.COENG-17026.

Postado

26-10-2026

Categorias